5-26-09

At this point, I have a climbable ladder going to the roof, and the front angled windows are blocked in. I finally figured out how to get a brush working like a door. I needed working bathroom stall doors! There was a lot of door-work on this iteration. A lot of the doors needed to be removed or changed due to how many there are. Maybe some will go back in. We'll see.

I also started cutting out windows and building an outdoors area. Somehow the outside of the building just came together like its supposed to.

















Started working a bit on the outside details of the building.


Comments

Popular posts from this blog

5-22-09

6-2-09

6-10-09